Keyword:
Category:
Tag:
Sort By:
“Hush Houses” receive operational upgrades
Hans Otte, local civilian contractor, paints inside the under construction “Hush House 2” test cell facility, Jan. 23, 2017, at Moody Air Force Base, Ga. A team of civilian contractors have performed upgrades while providing the 23d Component Maintenance Squadron test cell team ongoing support for the test cell facilities by contributing analysis of failures, component redundancy and upgrades for its operational capability requirements. (U.S. Air Force photo by Airman 1st Class Greg Nash)
Airman 1st Class Greg Nash
170123-F-OX377-1407.JPG
DOWNLOAD PHOTO
(0.69 MB MB)
Tags
U.S. Air Force, United States Air Force, Battlefield Airmen, 9th Air Force, Air Combat Command, USAF, ACC, Airmen , 23d Wing, Moody Air Force Base , 23 Wing, Team Moody, Attack-Rescue-Prevail, Georgia , Ninth Air Force , Flying Tigers
Back to Main Gallery