News Search

  • Power crews prevent electrical catastrophe

    On March 14, the 55th Civil Engineer Power Plant team received an alarming call – flood waters had surpassed the base perimeter and showed no signs of slowing. They needed to safely shut off power to all buildings in the flood path as the waters slowly encroached on the southeastern side of the

  • Team Offutt battling flood waters

    Like large portions of Nebraska, Offutt personnel are battling flood waters which started to creep onto the installation March 15.An increase in water levels upstream due to a record-setting snowfall this winter, in addition to a huge drop in air pressure earlier in the week, has overwhelmed the