News Search

  • A resilient future in the making

    Rebuilding an installation while continuing daily operations is no simple undertaking. Still, with the help of assisting agencies, members of Tyndall Air Force Base have met the challenge head-on, with 2024 being a big milestone year. However, with the excitement of a new year, installation

  • ZeroEyes technology helps detect potential firearm threats

    The rebuild of Tyndall Air Force Base has set a precedent for innovation with state-of-the-art facilities and cutting-edge technology being implemented across the installation. ZeroEyes, an artificial intelligence system that detects potential firearm threats, is among some of the latest

  • New reef project at Tyndall AFB aims to protect against storms

    On October 21, 2024, a groundbreaking project began at Tyndall Air Force Base, Florida, to build a special kind of oyster reef that could protect the base from future storms. This new reef, which combines both man-made materials and living oysters, is part of an innovative effort funded by the U.S.

  • Filtering water on Tyndall Air Force Base

    As Tyndall continues to grow into the Installation of the Future, ensuring the quality of groundwater across the installation is an important consideration that the Air Force and contractors are taking seriously by extracting, treating and testing potentially contaminated water while still

  • Tyndall celebrates the opening of four new fire facilities

    Team Tyndall celebrated the construction of four fire facilities, Sept. 27, 2023, at Tyndall Air Force Base. The four new facilities are the first buildings to be completed and officially transferred from contractors to the U.S. Air Force since the base was devastated by Hurricane Michael almost

  • Tyndall Rebuild makes ABM history

    The 337th Air Control Squadron, call sign "The Doghouse" is looking forward to the completion of its new training facility, a 30,000 square foot building equipped with everything the next generation of air battle managers need.

  • New technologies drive Tyndall’s Installation of the Future rebuild

    The Air Force Civil Engineer Center’s Natural Disaster Recovery Division has been at the forefront of implementing new technologies to reshape Tyndall Air Force Base into a model of adaptability, efficiency and sustainability for the Department of the Air Force and Department of Defense. Established

  • Record contract awarded for F-35 facilities at Tyndall AFB

    The Air Force Civil Engineer Center’s Natural Disaster Recovery Division, part of the Air Force Installation and Mission Support Center enterprise, is leading the rebuild, partnering with USACE to support the 325th Fighter Wing and its F-35 Program Integration Office to deliver the strategic vision

  • Tyndall’s Hololab debuts as virtual gateway to Installation of the Future

    The Digital Twin Hololab went live yesterday at Tyndall AFB to showcase the base’s digital transformation as part of Installation of the Future efforts. These cutting-edge planning concepts and innovative technologies will be integrated across the base and enable numerous capabilities for the

  • AFWERX drives innovation through flightline ops challenge

    Innovators and thought leaders from industry, academia and the federal government gathered at the AFWERX Innovation Hub in Las Vegas, Nevada, late last month to review technologies that will be a part of the Revolutionizing Flightline Operations AFWERX Challenge. This effort is a sequel to last

  • PMO Engineers thrive with ‘once in a lifetime’ billion-dollar rebuild

    The $4.25 billion rebuild of Tyndall Air Force Base may seem like an overwhelming task to some, but for three Air Force civil engineer captains at the heart of the Program Management Office, the project presents a once in a lifetime opportunity. Project managers for the PMO, and as part of the Air